Equipments and materials cannot be put in storage until they are verified and the form Acceptance Sheet for Incoming Products has been filled.
设备、材料必须经验收合格并填写“进货验收单”后方可入库。
After the completion of the garment, the garment size will do the final nuclear each other can be put in storage, to ensure that a pass rate of 97% above the mark.
成衣完成后,还将对成衣尺寸做最终核对方可入库,保证标志服一次合格率97%以上。
Without inspection or written approval, the goods exceeding the storage period must not be put in production or delivered to the users.
未经检验合格或未经书面批准,不能将该批货物投入生产或交付给用户。
应用推荐